The 5 principles in one sentence each
In Lean Thinking, James Womack and Daniel Jones summarize lean thinking in five principles. They form a logical sequence: the first defines what matters, the next three reorganize the work, and the last turns everything into habit.
- Value: define what the customer pays to receive.
- Value stream: see every step that takes the product to the customer.
- Flow: make the work move without stoppages.
- Pull production: produce when the customer consumes.
- Perfection: repeat the cycle without end.
The examples below are illustrative scenarios, made up to show the reasoning. The numbers add up, but they do not represent any specific company.
1. Value: the customer defines it
Value is what the customer recognizes and agrees to pay for. Everything else, even if the company needs it, is a cost to be reduced.
Scenario: a custom furniture factory believed customers valued a perfect finish on every face. After listening to buyers, it finds that what drives the decision is delivery time and measurement accuracy. The finish on the back face, which nobody sees, consumes 6 minutes per piece without creating perceived value.
The practical point: before optimizing any step, describe the value by product and by customer. The 7 wastes only make sense after this definition, because value is what separates useful activity from loss.
2. Value stream: see everything
The value stream is the set of all steps, with and without value, that the product goes through from raw material to customer. The goal is to make waiting, inventory and non-value-adding activities visible.
Scenario: an item takes 10 working days of 8 hours each to cross the factory. The summed processing time of the steps is 30 minutes.
Lead time = 10 × 8 × 60 = 4,800 min · Ratio = 30 ÷ 4,800 = 0.00625, or 0.6%
This means that for 99.4% of the time the product is sitting still or in a queue. The tool that shows this is value stream mapping. Any improvement plan should start with the longest wait, not with the slowest machine.
3. Flow: eliminate the stoppages
With the map in hand, the third principle reorganizes the work so that the product advances piece by piece, with no batches sitting between steps. This involves layout, balancing and setup reduction.
Scenario: three stations of 1 minute each process a batch of 100 pieces.
- In batches: each station processes all 100 pieces before passing them on. The first piece comes out in 100 + 100 + 100 = 300 min.
- In one-piece flow: the first piece comes out in 3 min, and the hundredth in 3 + 99 = 102 min.
The work is the same, and so is the capacity. What changes is the waiting time. To see the effect in detail, read about lead time and continuous flow.
4. Pull production: produce only what was consumed
Once flow is working, production stops following forecasts and starts reacting to consumption. The customer process withdraws, the supplier replenishes. The signal is usually a card, a marked space on the floor or an empty container.
Scenario: a packaging line keeps a small finished-goods supermarket. When the customer withdraws a box, the empty space authorizes production of another. If the supermarket has 6 positions, the maximum inventory is 6 boxes, by definition.
This ceiling is the difference between pull and push. The kanban guide details the mechanism, and the article on pull production shows how to adopt it in stages.
5. Perfection: the cycle that never ends
Perfection here is not a state to be reached but a direction. Each improvement exposes a new problem, which becomes the next opportunity. That is why the fifth principle depends on culture: short cycles, simple data and people with time to improve.
Scenario: after reducing lead time from 10 to 6 working days, the team realizes the new longest wait is in final inspection. It becomes the next target. The mechanism for this is PDCA applied repeatedly, and the spirit is in kaizen.
A table summarizes how the principles chain together:
| Principle | Key question | Sign that it works |
|---|---|---|
| Value | What does the customer pay for? | Value list per product |
| Value stream | Where does the product wait? | Map with real times |
| Flow | How long until the first piece? | Lead time falling |
| Pull | Who authorizes production? | Inventory with a defined ceiling |
| Perfection | What is the next problem? | Frequent improvement cycles |
Mistakes when applying the principles out of order
- Pull without flow: kanban tries to regulate a process full of stoppages and turns into a queue of cards.
- Flow without value: the factory makes faster something the customer does not want.
- Map and file away: the map becomes a poster, and no action comes out of it.
- Perfection as an end goal: the program is shut down at the end of the first project.
Next step
Choose a product family and answer the first principle in writing: what does the customer pay to receive? Then time the processing time and the lead time and calculate the ratio, as in the value stream scenario. The number is usually surprising and is the best argument for getting started. To broaden your repertoire, also see 5S on the shop floor as the first organization of the workstation.
Frequently asked questions
What are the 5 principles of Lean?
Value, value stream, flow, pull production and perfection. They are the five principles described by Womack and Jones in Lean Thinking.
Why do the principles have an order?
Because each one depends on the previous one. You must define value before mapping, have flow before pulling, and keep the improvement cycle going afterward.
Are the examples in the article from real companies?
No. They are illustrative scenarios, created to show the reasoning and the calculations.
Which principle is the hardest to apply?
Usually perfection, because it demands culture and discipline over years. Technically, flow tends to require the most layout and setup changes.
Keep studying
Sources
- WOMACK, J.; JONES, D. A Mentalidade Enxuta nas Empresas. Rio de Janeiro: Elsevier.
- ROTHER, M.; SHOOK, J. Aprendendo a Enxergar. São Paulo: Lean Institute Brasil.
- Lean Enterprise Institute. Lean Thinking and Practice. https://www.lean.org/lexicon-terms/lean-thinking-and-practice/
Keep studying: trusted sources and links
- Lean Enterprise Institute: What is Lean?
- Toyota Motor Corporation: Toyota Production System
- Wikipedia: Lean manufacturing
- Wikipedia: Value-stream mapping
Save this address: Manufatura Enxuta is your school for lean manufacturing. Come back whenever you need to study, with a complete article, a visual map and trusted sources. Follow one of the learning paths or check the A–Z glossary.
Want a quick guide to keep on the shop floor?
Download the free Pocket Guide e-book with the lean tools summarized in one page each.
Download the e-book