Quick answer: Shigeo Shingo was a Japanese industrial engineer, a consultant to Toyota and other companies, associated with two core lean techniques: quick changeover (SMED) and poka-yoke, a device that stops an error before it becomes a defect. He complemented the Toyota Production System with engineering methods.
Who was Shigeo Shingo
Shigeo Shingo (1909 to 1990) was a Japanese industrial engineer who worked as a productivity and quality consultant, including for Toyota. His name became tied to SMED and poka-yoke, two techniques now present in factories all over the world.
He wrote technical books that spread these methods outside Japan, among them A Revolution in Manufacturing: The SMED System and Zero Quality Control: Source Inspection and the Poka-yoke System, published in English in the 1980s. There is also an operational excellence award in the United States that carries his name.
Check dates and titles in the book editions before citing them in formal work. Shingo is usually cited alongside Taiichi Ohno: Ohno was the architect of Toyota's production system, and Shingo contributed engineering techniques that made the system possible in practice.
SMED: changing tooling in minutes
SMED stands for Single Minute Exchange of Die, a die change in single-digit minutes. Shingo's central idea was to distinguish two types of activity in a tooling changeover (setup):
- Internal: can only be done with the machine stopped, such as loosening and clamping the die.
- External: can be done while the machine is running, such as gathering tools, fetching material and preparing the fixture.
Many changeovers take long because external activities are done with the machine stopped. Moving everything possible to the external side reduces machine downtime, without buying new equipment. This allows smaller batches, more variety and less inventory, which fits with just-in-time.
The best-known account is that of a large Toyota press, where the changeover is said to have dropped from hours to a few minutes over some months of work. Exact numbers vary by source. What matters is the logic of the method, which works on presses, injection molding machines, packaging machines and even administrative activities.
The SMED steps
| Step | What to do | Example |
|---|---|---|
| 0. Study the current situation | Time and film the changeover, without separating anything | A 90-minute changeover, with everything mixed together |
| 1. Separate internal and external | List each task and classify it | 30 minutes were external tasks done with the machine stopped |
| 2. Convert internal to external | Prepare beforehand, preheat, standardize heights and fixtures | Preheat the die outside the machine: 15 minutes less |
| 3. Improve every aspect | Simplify clamping, eliminate adjustments, run tasks in parallel | Quarter-turn fasteners: 15 minutes less |
Worked example. A press does two changeovers per 8-hour shift, and each one takes 90 minutes. The gain from each step:
| Step | Reduction | Machine downtime per changeover |
|---|---|---|
| Starting point | 90 min | |
| Separate and move the external work out of the stop | − 30 min | 60 min |
| Convert internal to external (preheating) | − 15 min | 45 min |
| Simplify clamping | − 15 min | 30 min |
The changeover fell from 90 to 30 minutes, a reduction of 60 minutes, or about 67%. With two changeovers per shift, the machine goes from being stopped 2 × 90 = 180 minutes to 2 × 30 = 60 minutes. Gain: 120 minutes per shift, or 2 hours of capacity returned to production, with no machine investment. The savings are bigger if changeover time is a bottleneck, as OEE usually shows in availability.
SMED techniques in practice
| Technique | What changes | Example |
|---|---|---|
| Quick-release fasteners | Replaces long bolts with quarter-turn fasteners, clamps or latches | Clamp the die with 4 latches instead of 12 bolts |
| Guide and centering pins | Eliminates position adjustment when mounting the tool | A die that always seats in the same position |
| Standardized heights and dimensions | Avoids shims and adjustments between different tools | All dies with the same shut height |
| Parallel operations | Two people work at the same time, on opposite sides of the machine | One loosens while the other prepares the next tool |
| Changeover cart or kit | Everything the changeover needs in a single organized cart | Wrenches, shims and parts gathered and labeled |
| Eliminating adjustments | Replaces trial-and-error adjustment with fixed references or scales | A scale with marks for each product |
Start with the cheapest techniques, such as organization and standardization, which depend on method and discipline rather than on buying equipment. Gains that require more investment are left for later, when the result of the first actions justifies them.
Poka-yoke and source inspection
Shingo's second well-known contribution is poka-yoke, Japanese for "avoiding inadvertent errors". The most-told story says he replaced the earlier term, considered offensive, with one that does not blame the person: human error is natural and the system has to prevent it.
Shingo distinguished three types of inspection:
- Judgment inspection: separates good from bad product after the fact. It does not prevent the defect.
- Informative inspection: uses the result to correct the process, as in successive checks and self-checks.
- Source inspection: verifies the conditions that cause the error before it happens. It is the most effective.
Poka-yoke devices work through three classic methods: contact (the shape of the part only allows it to fit one way), fixed value (counts the number of cycles or parts and alerts if one is missing) and motion sequence (checks whether the steps were done in order). For each method, there is a control function (stops the process from continuing) or a warning function (gives notice). Control is stronger.
The tightening counter that stops the part from advancing without all four screws is an example of the fixed-value method. See the case in the PFMEA article. The principle connects with jidoka: the process stops, and the problem is solved at the source.
Poka-yoke examples by method
| Method | How it works | Factory example |
|---|---|---|
| Contact | The shape or size of the part only allows the correct fit | Connector with a position key, a fixture that only accepts the part in the right position |
| Fixed value | Counts the number of movements, parts or cycles and alerts if it is wrong | Tightening counter: releases the part only with all 4 screws |
| Motion sequence | Checks whether the steps were done in the right order | Sensors that confirm the assembly order of the parts |
| Presence sensor | Detects the absence or excess of a part before moving on | Sensor that confirms the washer before tightening |
| Parameter control | Stops the cycle if the variable leaves the range | Press that does not cycle if the pressure is outside the limit |
The question that guides the choice is: what is the simplest way to make the error impossible? If it cannot be prevented, warn immediately, at the point where the error happens. Simple, cheap devices made with the team last longer than sophisticated solutions.
The ideas behind the techniques
- Errors happen, defects do not have to. A person makes mistakes, but the process can stop the error from becoming a defect.
- Attack the cause, not the symptom. This ties in with root cause analysis, such as the 5 Whys.
- Think like a process engineer. Measure, simplify and standardize, with data and experiments.
- Fast results, with little money. SMED and poka-yoke are low-cost, high-return techniques.
How to apply it today
SMED, in five steps:
- Choose the machine with the most changeovers or the one that limits the flow.
- Film a complete changeover and list all the tasks, with times.
- Classify each task as internal or external and move what you can out of the stop.
- Standardize tools, heights and fasteners, and create an organized changeover kit (see 5S).
- Record the new standard, train the shifts and measure again.
Poka-yoke, in four steps:
- List the most frequent defects, with a Pareto chart.
- Find out at which step the error originates.
- Design a simple device: guide, sensor, counter, fixture.
- Test it, and check that the error no longer occurs.
Improvement is continuous: each gain becomes the new standard of kaizen.
Common mistakes when applying Shingo's ideas
- Measuring the changeover only with the average. Time real changeovers and investigate the worst ones.
- Skipping the step of separating internal and external. Without it, the gain is small.
- Changing faster without controlling quality. A poorly done adjustment creates scrap on the first part.
- A poka-yoke device that the operator bypasses. If it gets in the way of the work, it will be switched off. Involve the people who operate.
- Doing it on every machine at once. Start with the bottleneck and take the learning to the rest.
Frequently asked questions
Who was Shigeo Shingo?
He was a Japanese industrial engineer (1909 to 1990), a consultant to Toyota and other companies, associated with SMED (quick changeover) and poka-yoke (mistake-proofing devices).
What is SMED?
It is a method for reducing tooling changeover (setup) time. The idea is to separate what can only be done with the machine stopped (internal) from what can be done while it runs (external), move as much as possible to the external side, then simplify what is left.
What does poka-yoke mean?
It is a Japanese term for avoiding inadvertent errors. It describes devices and methods that prevent errors or warn about them before they become defects.
What is the difference between Shingo and Ohno?
Ohno was the chief architect of the Toyota Production System. Shingo worked as a consultant and contributed engineering techniques such as SMED and source inspection.
What are the SMED steps?
Study the current situation, separate internal and external activities, convert internal to external and improve every aspect of the changeover.
What is the Shingo Prize?
It is an operational excellence award in the United States that carries the name of Shigeo Shingo. Check the institute's official website for the criteria and the current status.
Sources
- SHINGO, S. A Revolution in Manufacturing: The SMED System. Portland: Productivity Press, 1985.
- SHINGO, S. Zero Quality Control: Source Inspection and the Poka-yoke System. Portland: Productivity Press, 1986.
- LIKER, J. K. The Toyota Way. New York: McGraw-Hill, 2004.
- Lean Enterprise Institute, general reference on lean: https://www.lean.org/
This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.
Want to reduce losses on your line?
Download the free Metrics That Matter e-book, with OEE, takt time and visual management.
Download the e-book