What is a PFMEA

The PFMEA (Process Failure Mode and Effects Analysis, or Process FMEA) examines the manufacturing or assembly process, step by step. It answers one direct question: even with a correct design, how can the process deliver a bad part, and how do we prevent or detect that?

It is the most widely used technique for moving from firefighting to prevention. Instead of waiting for the complaint, the team imagines the failures beforehand and defines controls. In the automotive industry it is required together with the control plan within APQP and PPAP, but it works for any factory.

The article on FMEA explains the technique in general. This article's companion, on the DFMEA, covers the product design side.

When to do it and who takes part

Bring the team together at the workstation when possible. Watching the operation at the gemba reveals failures that a meeting room does not.

The 7 steps of the PFMEA

The harmonized AIAG-VDA handbook (2019) uses the same seven steps as the DFMEA, adapted to the process:

  1. Planning and preparation: scope (which processes), team, schedule, tools and a lessons-learned base.
  2. Structure analysis: process flowchart and, for each step, the work elements, such as machine, person, material and environment (4M). Many companies extend this to 6M, adding method and measurement.
  3. Function analysis: what the step must do and which product characteristic it guarantees.
  4. Failure analysis: the chain of effect, failure mode of the step and cause tied to one of the work elements.
  5. Risk analysis: severity, occurrence and detection ratings, taking the current controls into account, and the action priority.
  6. Optimization: actions to reduce risk, with an owner and a due date, and a reassessment once they are done.
  7. Results documentation: recording and communicating the conclusions.

A good starting point is the SIPOC and the flowchart. Without clear steps, the PFMEA turns into a list of problems with no owner.

How to describe function, failure, effect and cause

ElementQuestionExample (fastening station)
StepWhich operation am I analyzing?Tighten four M6 screws on the cover
Step functionWhat does it guarantee in the product?Each screw at a torque of 10 ± 1 N·m, all present
Failure modeHow does the function stop being fulfilled?Torque below specification
EffectWhat happens at the customer and in the following steps?Cover loosens, lubricant leaks and a warranty claim follows
CauseWhy does the failure mode happen?Screwdriver out of calibration
Prevention controlWhat reduces the chance of the cause?Scheduled tool calibration
Detection controlWhat finds the cause or the failure?Sampling inspection with a click-type torque wrench

Write the effect on three levels, as the handbook suggests: effect in the plant itself (rework, scrap), effect on the next customer (line stoppage) and effect on the end user (safety, function). Severity comes from the worst plausible effect.

Watch out for a frequent mistake: "lack of training" is almost never a good cause. Look for the mechanism: did the operator not know the sequence? Was the instruction unreadable? Did the fixture allow a wrong assembly? The 5 Whys help you reach that level.

Severity, occurrence and detection in the process

RatingWhat it measuresIn a PFMEA, look at
Severity (S)How serious the effect isThe worst effect on the end customer or on safety. It only changes if the effect changes, not because of inspection
Occurrence (O)Likelihood that the cause happensPrevention: maintenance, fixture, instruction, training, measured stability (for example, Cpk)
Detection (D)Ability to find the cause or the failure before the part leaves the processAutomatic controls, inspection, measurements. Automatic usually detects better than visual

Golden rule: severity does not go down with inspection. Inspecting improves detection, but the effect of a bad part reaching the customer stays the same. To reduce severity you can only change the product (DFMEA) or the effect.

Advertisement

Worked example: a cover fastening station

A teaching example, fictional. An assembly station with an electric screwdriver to fasten a cover with four M6 screws, specified torque of 10 ± 1 N·m. The team analyzed the step and listed three failures:

Failure mode / effectCauseSCurrent preventionOCurrent detectionDS×O×D
Torque below specification. Cover loosens and lubricant leaksScrewdriver out of calibration8Calibration every six months4Sampling with a click-type torque wrench6192
Missing screw. Insufficient cover fasteningOperator skips a screw, no counting7Work instruction5Visual inspection at the exit7245
Damaged thread. Screw does not holdScrew enters the thread crooked6Positioning guide3Torque curve monitoring472

Reading. The highest product is the missing screw (245), followed by low torque (192). But low torque has severity 8: it can leak and cause a warranty claim. By action priority, the first two rows call for action. The third (72) stays under monitoring.

Actions:

ChainActionNew ONew DNew S×O×D
Low torqueScrewdriver with torque control and an out-of-range cycle alarm, plus a daily check with a torque wrench228 × 2 × 2 = 32
Missing screwTightening counter on the screwdriver: the part is only released after 4 approved cycles (poka-yoke)227 × 2 × 2 = 28
Damaged threadKeep the current control346 × 3 × 4 = 72

The strongest action was the tightening counter: it takes the decision out of the operator's hands and stops the part from moving on. This is the principle of poka-yoke. Controls that prevent the failure (prevention) are worth more than those that only find it.

Note: illustrative numbers. In a real PFMEA, ratings and criteria follow the table adopted by the company or the customer.

From the PFMEA to the control plan

The control plan is the operational version of the PFMEA. Every control defined in the analysis has to appear in it, with method, frequency, sample size and reaction plan:

From the PFMEAGoes to the control plan as
Prevention control (calibration, fixture)Equipment maintenance and verification, with a set interval
Detection control (inspection, measurement)Measurement method, instrument, frequency, sample size
Special characteristicIdentification and a capability requirement, such as Cp and Cpk
Corrective actionReaction plan for when the measurement falls outside the specification

If the process is measured, confirm the reliability of the instruments with measurement system analysis (MSA), and use statistical process control to track stability.

Common mistakes in a PFMEA

Process audits, such as VDA 6.3, usually check whether the PFMEA reflects what really happens on the shop floor.

Frequently asked questions

What is a PFMEA?

It is the Process FMEA: a risk analysis that examines each step of the manufacturing or assembly process to predict failures, their effects and the controls that prevent or detect them.

What is the difference between PFMEA and DFMEA?

The PFMEA analyzes the production process (machine, method, labor, material). The DFMEA analyzes the product design (geometry, material, tolerance). The two complement each other, and the critical characteristics from the DFMEA are an input to the PFMEA.

When should I do the PFMEA?

Before series production, with the process flow defined, and again at every change of process, equipment or supplier, or after a repeated complaint or scrap.

How does the PFMEA relate to the control plan?

The control plan turns the controls defined in the PFMEA into routine: what to measure, how, how often and what to do if it falls outside the specification.

Can I reduce severity with inspection?

No. Inspection improves detection. Severity depends on the effect and only goes down if the product or the effect changes.

What is action priority (AP)?

It is the criterion of the AIAG-VDA handbook (2019) that classifies each failure chain as high, medium or low priority from severity, occurrence and detection, giving more weight to severity. In practice it replaces a decision based on the RPN alone.

Sources

  1. AIAG; VDA. FMEA Handbook (harmonized AIAG and VDA FMEA manual). 1st edition, 2019.
  2. AIAG. Advanced Product Quality Planning (APQP) and Control Plan.
  3. AIAG website, for consulting the manuals: https://www.aiag.org/

This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.

Want to solve problems at the root?

Download the free Problem Solving Kit e-book, with PDCA, A3, 5 Whys and Ishikawa.

Download the e-book
Advertisement
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.