Engineering desk with a plastic fastening clip, calipers and a screen showing a product structure diagram

Quick answer: the DFMEA (Design FMEA) is the analysis the engineering team runs before a design is released, to find out how the product can fail, what the customer experiences when it does, and which design action reduces the risk. It looks at the product, not the factory: the process is the job of the PFMEA.

Advertisement

What is a DFMEA

The DFMEA (Design Failure Mode and Effects Analysis, or Design FMEA) is the application of FMEA to the design of a product, a component or a system. The team asks, function by function: how can this fail, what does the customer feel when it fails, why would it fail, and what does the design already do to prevent or detect the failure?

It is done while the design can still change. Changing a geometry, a material or a tolerance on the engineering desk costs little. After the tooling is built and the pilot lot is run, the same change costs far more. That is why the DFMEA is one of the core documents of APQP and PPAP, in the automotive industry and in other sectors that follow the same practices.

If you do not know the technique in general yet, start with the guide to FMEA. This article covers the design side, and its companion article covers the PFMEA, the process FMEA.

DFMEA or PFMEA: what is the difference

Both use the same logic (failure mode, effect, cause, severity, occurrence and detection). What changes is the object of study and who can answer the questions.

PointDFMEAPFMEA
ObjectProduct, system or componentManufacturing or assembly process steps
Central questionDoes the design perform its function over the whole service life?Does the process build what the design calls for, every time?
Typical causesGeometry, material, tolerance, interface, load, temperatureMachine, method, material, labor, measurement, environment
WhenBefore design releaseBefore series production, together with the control plan
Who leadsProduct engineeringProcess engineering and quality
Main outputDesign actions and special characteristicsProcess controls and the control plan

Rule of thumb: if the cause goes away only by changing the drawing, it belongs to the DFMEA. If it goes away by changing how the part is made or inspected, it belongs to the PFMEA. A part can be well designed and badly made, and the opposite can also happen. That is why the two documents talk to each other: the critical characteristics that come out of the DFMEA are an input to the PFMEA.

The 7 steps of the DFMEA (AIAG-VDA approach)

The harmonized AIAG and VDA handbook, published in 2019, organizes the FMEA in seven steps. They apply to both the DFMEA and the PFMEA:

  1. Planning and preparation: defines purpose, scope, schedule, team and tools. The handbook sums up this care in a checklist known as the 5Ts.
  2. Structure analysis: breaks the product into levels (system, subsystem, component) to show what is inside and outside the analysis.
  3. Function analysis: describes what each element must do, with measurable requirements.
  4. Failure analysis: builds the chain of effect, failure mode and cause for each function.
  5. Risk analysis: rates severity, occurrence and detection, taking the existing controls into account, and sets the action priority.
  6. Optimization: defines actions, owners and due dates, carries them out and reassesses the risk.
  7. Results documentation: records the conclusions and communicates them to the customer, the team and the next documents.

The big novelty of the harmonized handbook was the Action Priority (AP), which now guides the decision in place of the old RPN. You will see why further down.

Structure, function and the failure chain

The most common mistake in a DFMEA is writing loose failures with no link to a function. The right path is always this one:

Note that the DFMEA cause is a design cause. "Operator assembled it wrong" is not a DFMEA cause, it belongs to the PFMEA. "Geometry allows it to be assembled upside down" is a DFMEA cause, because the drawing lets the error happen. That is where poka-yoke enters already at the design stage.

To investigate causes with the team, the Ishikawa diagram and the 5 Whys help a lot.

Severity, occurrence and detection

Each failure chain gets three ratings from 1 to 10:

RatingWhat it measuresIn a DFMEA, look at
Severity (S)How serious the effect is for the customer or for safetyThe worst plausible effect. Safety and legal requirements get a high rating
Occurrence (O)Likelihood that the cause happensThe design's prevention controls: design rules, standards, tested material, usage history
Detection (D)Ability to find the cause or the failure before the design is releasedThe detection controls: simulation, tests, prototypes, reviews

For detection, a rating of 10 means the design has no way of finding the problem before release, and a rating of 1 means detection is almost certain. The criteria tables (what counts as a 3, a 5 or an 8) come from the handbook and from your company or customer rules. Use a single table per company, otherwise ratings from different teams cannot be compared.

Advertisement

Worked example: a plastic clip on a wiring harness

A teaching example, fictional. The item analyzed is a plastic clip that holds a harness to a panel. Function: keep the harness fixed, with no more than 2 mm of play, for the whole life of the product. The team listed three failure chains:

Failure mode / effectDesign causeSCurrent preventionOCurrent detectionDS×O×D
Clip cracks during assembly. Loose harness rubs on a metal edge and damages the insulationSharp corner concentrates stress8Minimum radius rule5Finite element simulation4160
Clip loses retention at 85 °C. Harness vibrates and makes noiseMaterial loses stiffness with heat6Selection from the datasheet4Thermal aging test372
Clip assembled upside down. Insufficient retentionSymmetric geometry, no position cue5None6Design review7210

Reading. By the S×O×D product, the third row (210) comes first. But the first row, with severity 8 and 160 points, cannot wait: an effect that damages the insulation of a harness is far more serious than noise. That is exactly why the AIAG-VDA handbook replaced the RPN with the action priority, which puts severity first.

Actions defined by the team:

ChainDesign actionNew ONew DNew S×O×D
1. Cracks during assemblyIncrease the corner radius and validate with an assembly test on a pilot lot of prototypes338 × 3 × 3 = 72
2. Loses retention at 85 °CKeep the material and follow the result of the test already planned436 × 4 × 3 = 72
3. Assembled upside downMake the geometry asymmetric so it only fits in the right position235 × 2 × 3 = 30

Notice that the most effective action was number 3: it removed the possibility of the error in the drawing, instead of relying on a warning or an inspection. Actions that reduce occurrence (prevention) are worth more than those that only improve detection. The severity of chain 1 stays at 8, because it only changes if the effect stops existing, and that did not happen.

Note: the numbers above are illustrative. In a real project, the ratings depend on the criteria table adopted and on the team's consensus.

From RPN to action priority (AP)

The RPN (risk priority number) is the product S × O × D. It is simple, but it has a known flaw: very different combinations give the same number, and a serious effect with low likelihood can fall below a mild, frequent problem. That is what the example above showed.

The AP (Action Priority) in the AIAG-VDA handbook classifies each chain as high, medium or low using a table that considers S, O and D, with severity first. With high severities, the priority tends to be high or medium even when occurrence and detection are intermediate. The full table is in the handbook and should be read there, since edition changes or customer requirements may apply. On this site, the article on FMEA has a summary of the AP.

In practice: treat any chain with severity 9 or 10 as a priority, define actions for those with high priority, and use the RPN only as a supporting number, if your customer still requires it.

The DFMEA does not end with itself. It feeds the sequence of quality documents:

If a DFMEA cause cannot be eliminated in the design, it has to become a process control. Recording that is what closes the loop.

Common mistakes in a DFMEA

Keep the DFMEA alive: reopen the analysis when there is a design change, a field failure, a complaint or a new requirement. Handling customer complaints is a good source of updates.

Frequently asked questions

What is a DFMEA?

It is the Design FMEA: a risk analysis done by product engineering, before design release, to identify how the product can fail, what the effect is and which design action reduces the risk.

What is the difference between DFMEA and PFMEA?

The DFMEA analyzes the product design (geometry, material, tolerance). The PFMEA analyzes the manufacturing process (machine, method, labor). Causes that are fixed by changing the drawing belong to the DFMEA. Causes that are fixed by changing the process belong to the PFMEA.

When should the DFMEA be done?

While the design can still be changed at low cost, before release to tooling and production. It should be reviewed with every design change, field failure or new requirement.

Who should be on the team?

Product engineering as the leader, plus process, quality, maintenance, purchasing and, when possible, the customer. Cross-functional teams find more failures and causes.

What do S, O and D mean?

Severity (how serious the effect is), occurrence (likelihood that the cause happens) and detection (ability to find the cause or the failure before release), each from 1 to 10. The criteria tables come from the handbook and from company rules.

Is the RPN still used?

Many companies and customers still use the RPN (S × O × D). The 2019 AIAG-VDA handbook moved the decision to the Action Priority (AP), which gives more weight to severity. Follow what your customer or your internal standard requires.

Sources

  1. AIAG; VDA. FMEA Handbook (harmonized AIAG and VDA FMEA manual). 1st edition, 2019.
  2. AIAG. Advanced Product Quality Planning (APQP) and Control Plan.
  3. AIAG website, for consulting and buying the manuals: https://www.aiag.org/

This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.

Want to solve problems at the root?

Download the free Problem Solving Kit e-book, with PDCA, A3, 5 Whys and Ishikawa.

Download the e-book
Advertisement
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.