Conveyor with boxes piled up in front of a machine and a monitor showing a lead time chart

Quick answer: WIP (work in process, also called work in progress) is all the material that has entered production and has not yet become a finished product: parts waiting, being processed or sitting between operations. By Little's Law, WIP = throughput × lead time. Reducing WIP shortens the production lead time and frees up capital, without having to produce faster.

Advertisement

What is WIP

WIP stands for work in process (or work in progress), also called in-process inventory. It is everything that has left the raw material stockroom, entered production and has not yet reached finished goods inventory.

The three main types of manufacturing inventory help locate the WIP:

TypeWhat it isWhere it sits
Raw materialPurchased material, not yet usedIncoming stockroom
Work in process (WIP)Material being transformed or waiting for the next operationOn the shop floor, between machines, on pallets and carts
Finished goodsProduct ready for deliveryShipping

In accounting, WIP usually appears as goods in process inventory. In lean management, it gets special attention because it is the inventory that hurts flow the most and the one you see the least.

Why WIP matters

In lean language, excess WIP is the visible form of the wastes of inventory and waiting, and it usually hides flow problems, long setups and stoppages. It is among the wastes of lean.

How to calculate WIP and Little's Law

There are two ways to measure it. The first is direct counting: at each hour or shift, add up the parts or batches waiting and being processed at each point of the flow. The second uses Little's Law, a mathematical relationship between three quantities of a stable process:

WIP = throughput × lead time

Lead time = WIP ÷ throughput

Throughput is the quantity that leaves the process per unit of time, and lead time is the time a part takes from entry to exit. The law holds for roughly stable processes, and was proved by John D. C. Little, in 1961, in the context of queues.

The practical consequence is strong: if throughput does not change, reducing WIP reduces lead time in the same proportion.

Worked example: from 480 to 240 parts

A teaching example. A line produces 120 parts per hour and, in one count, there were 480 parts in process, distributed like this:

StepWIP before (parts)WIP after (parts)
Cutting15060
Machining19080
Assembly9060
Painting5040
Total480240

Calculations using Little's Law:

ItemBeforeAfter
Lead time (WIP ÷ throughput)480 ÷ 120 = 4 hours240 ÷ 120 = 2 hours
WIP value (average cost of $35 per part)480 × 35 = $16,800240 × 35 = $8,400
Production cost per day (120 × 8 h × $35)$33,600$33,600
WIP coverage in days of production16,800 ÷ 33,600 = 0.5 day8,400 ÷ 33,600 = 0.25 day

Keeping the same throughput of 120 parts per hour, lead time fell from 4 to 2 hours, and the capital tied up in the process fell from $16,800 to $8,400, a release of $8,400. To reach a 2-hour lead time at 120 parts per hour, the WIP limit is 120 × 2 = 240 parts. This number becomes the rule that guides the flow.

Note: throughput is only maintained if the bottleneck is well supplied. Reducing WIP without fixing stoppages and variation can, on the contrary, reduce output. That is why you reduce gradually.

Why WIP grows

CauseHow it creates WIPSymptom on the shop floor
Large batchesEach part waits for the whole batch to be processedFull pallets in front of the machines
Long setupsTo make up for the slow changeover, you produce in large batchesFew changeovers per day, batches that last days
Poorly supplied or unstable bottleneckUpstream steps produce beyond the bottleneck's capacityQueue growing before the bottleneck, empty after it
Stoppages and breakdownsWhen one step stops, the others keep going and pile upInventory appears and disappears with the stoppages
Early schedulingOrders released beyond what the flow can handleFactory full of open orders
Rework and parts under reviewParts outside the normal flow wait for a decisionA "quarantine" area that is always full
Advertisement

7 ways to reduce WIP

  1. Limit WIP per step. Define the maximum allowed between operations. When the limit is reached, the previous step stops. This is the principle of kanban.
  2. Reduce batch sizes. Smaller batches cut the wait per batch. It depends on faster setups (see SMED).
  3. Balance the flow to takt time. Steps with different times create queues. Calculate takt time and level the loads.
  4. Create continuous or one-piece flow where it makes sense, bringing the operations closer together.
  5. Eliminate the stoppages and breakdowns that make the queue build up, with maintenance and OEE.
  6. Level production. Demand peaks create WIP peaks. See heijunka.
  7. Make WIP visible. Boards, floor markings and visual management show the queue before it becomes a problem.

To see where WIP builds up, the value stream map shows the inventory triangles between steps.

How to apply the WIP limit on the shop floor

In the previous example, the total WIP limit was 240 parts. Distribute that limit among the steps and make it visible on a board or with floor markings:

StepWIP limit (parts)Rule
Cutting60When it reaches 60, cutting stops and helps the next step
Machining80Bottleneck: it must never run out of parts, so it gets the highest limit
Assembly60Only receives what it can assemble at the takt pace
Painting40Lower limit because of space and the cost of each part

The rule is simple: you only produce when there is free space in the next step. Over time, adjust the limits based on the result: if a step stops for lack of parts, the limit is too low. If WIP keeps building up, it is too high, or there is a flow problem to solve.

The same logic applies outside the factory. In offices, hospitals and development teams, WIP is the tasks, patients or orders in progress. Limiting what is in progress speeds up the completion of what has already started. See the application in Lean Office.

Metrics to track WIP

MetricFormulaWhat it is for
Total WIPSum of the parts in processControl the level of in-process inventory
WIP per stepParts at each point of the flowLocate where the queue forms
Lead timeWIP ÷ throughputPredict the production lead time
WIP valueParts × average costMeasure the tied-up capital
WIP coverageWIP value ÷ daily production costCompare WIP with the factory's pace

Track the series over time. A single measurement says little. WIP that grows without an increase in throughput is a warning of a flow or quality problem.

Common mistakes when handling WIP

Frequently asked questions

What is WIP?

It is work in process (work in progress): material that has entered production and has not yet become a finished product, whether being processed or waiting for the next operation.

How do you calculate WIP?

By directly counting the parts in process at each step, or by Little's Law: WIP = throughput × lead time. In a process with 120 parts per hour and a lead time of 4 hours, WIP is 480 parts.

What does Little's Law say?

In a stable process, the average number of items in the system equals the throughput multiplied by the average time each item takes to go through it. That is why reducing WIP reduces lead time if throughput is maintained.

Is high WIP always bad?

A minimum level is needed to keep the flow going and protect the bottleneck. The problem is the excess, which lengthens lead time, hides defects and ties up capital.

What is the difference between WIP and inventory?

WIP is a type of inventory: the one that is in process. The other types are raw material and finished goods.

How do you reduce WIP?

By limiting WIP per step (kanban), reducing batches with quick setups, balancing the flow to takt time, eliminating stoppages, leveling production and making WIP visible.

Sources

  1. LITTLE, J. D. C. A Proof for the Queuing Formula: L = λW. Operations Research, v. 9, n. 3, 1961.
  2. HOPP, W. J.; SPEARMAN, M. L. Factory Physics. McGraw-Hill.
  3. ROTHER, M.; SHOOK, J. Learning to See. Lean Enterprise Institute.
  4. IAS 2 Inventories. IFRS Foundation.

This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.

Want to measure your line's performance?

Download the free Metrics That Matter e-book, with OEE, takt time and visual management.

Download the e-book
Advertisement
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.