An old line layout with several scattered machines next to a new cell-shaped layout, connected by a large arrow

Quick answer: Kaikaku is radical, large-scale change over a short period that reshapes an entire process, layout or system. While kaizen improves little by little every day, kaikaku takes a leap. The two complement each other: kaikaku changes the level and kaizen maintains and refines the new standard.

Advertisement

What is kaikaku

Kaikaku (改革) means reform, restructuring or radical innovation. In Lean, it is the large, fast change that reorganizes how work flows: a new layout, a cell instead of process-based lines, a new technology or a redefinition of the value stream.

It is usually contrasted with kaizen (改善), which is continuous improvement, in small steps and with everyone's participation. I believe the contrast is present in the lean literature, as in works by Womack and Jones, but you should verify the wording in the sources at the end before citing it.

Kaikaku vs kaizen

AspectKaizenKaikaku
Scale of changeSmall, incrementalLarge, radical
PaceContinuous, every dayOne-off, in a project with a set deadline
Who leadsEveryone, especially those who run the processLeadership, with a dedicated team and support from operations
InvestmentLow, almost alwaysHigher, may involve equipment and layout
RiskLow, easy to reverseHigher, requires planning and a pilot
Typical resultSmall, accumulated gainsA performance leap at once
After the changeKeeps improvingNeeds kaizen to maintain and refine

When to use kaikaku

If the problem is isolated, kaizen solves it. If the system design is the problem, it is kaikaku.

Factory example: from process lines to a cell

Fictional example, only to show the method. A plant made machined parts in process-based departments (lathe, milling, drilling). Each part went through 3 departments, in batches of 200 with waiting between them. Indicators before:

IndicatorBefore (process layout)After kaikaku (U-shaped cell)After 3 months of kaizen
Lead time12 days3 days2.5 days
Work in process (WIP)2,400450380
Distance traveled by the part180 m12 m12 m
Floor space used420 m²260 m²260 m²
Defect detected only at the endCommonDetected at the next stationPoka-yoke at critical points

The kaikaku (the new cell, the new layout and the smaller batch) produced the leap from 12 to 3 days. The kaizen that followed (tool adjustments, 5S, balancing) refined it to 2.5. See the technical detail of the U-shaped cell.

How to lead a kaikaku

  1. Define the objective and the metric. Lead time, cost, quality, space. Without a numerical target, the project loses direction.
  2. Understand the current state. Map the flow, measure times and distances.
  3. Design the future state. Use the future-state VSM and the takt time calculation.
  4. Build support. Talk to the affected people before deciding (nemawashi).
  5. Run a pilot whenever possible. Test the idea on one line or one shift before replicating.
  6. Implement with a short deadline and a dedicated team. A kaizen blitz event can be the format for implementing part of the project.
  7. Stabilize and standardize. Write down the new method and train the people.
  8. Move to kaizen. After the leap, the team takes over daily improvement.

Risks and precautions

Advertisement

Signs: is it kaizen or kaikaku?

Observed signMost likely path
Isolated losses at one station, known causeKaizen
The flow crosses several departments, with queues between themKaikaku (layout and flow)
High lead time even though every station is efficientKaikaku (the design is the problem)
The team suggests small improvements every month, with visible resultsKaizen
New product or a large change in mixKaikaku (redesign the flow)
Company target requires a reduction of 50% or more in a short timeKaikaku, followed by kaizen

Readiness checklist for a kaikaku

The human side of kaikaku

Radical change touches habit, territory and job security. Explain why the change is necessary before showing how it will be done. Involve the operators in the design of the new workstation, because they know details the project does not see. And make it clear that the productivity gain is not a headcount-cutting target, if that is the company's commitment. Without trust, kaikaku turns into resistance.

Communication should be frequent, simple and data-based: what changes, when, what will be measured and how people will be supported during the transition.

Kaikaku and kaizen event: what is the difference?

The kaizen event (or kaizen blitz) is a work format: a team dedicates a few days to improving a specific area. It can be used to implement part of a kaikaku, but also for smaller improvements. What defines kaikaku is the scale and type of change (it reshapes the system), not the execution format.

Frequently asked questions

What is kaikaku?

It is radical, large-scale change in a process, layout or system, in contrast to kaizen, which is continuous improvement in small steps.

What is the difference between kaikaku and kaizen?

Kaizen improves little by little and continuously, with low risk. Kaikaku changes the level at once, with higher investment and risk. The two complement each other.

When should I use kaikaku?

When the process design is the cause of the problem, when the product, demand or technology change, or when the gains from kaizen have run out and the target is still far away.

Is kaikaku the same as a kaizen event?

No. The kaizen event is a work format of a few days. Kaikaku is a type of change, radical and large-scale. An event can be used to implement part of a kaikaku.

What should I do after kaikaku?

Stabilize the new process, standardize the method and move to daily kaizen, which maintains and refines the new level.

Does kaikaku apply to small companies?

Yes, at their scale: rearranging an area, creating a cell or changing the replenishment method can be a local kaikaku. The important thing is to measure before and after.

Sources

  1. WOMACK, J. P.; JONES, D. T. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York: Simon & Schuster, 1996.
  2. IMAI, M. Kaizen: The Key to Japan's Competitive Success. New York: Random House, 1986.
  3. ROTHER, M.; SHOOK, J. Learning to See. Cambridge: Lean Enterprise Institute, 1999.
  4. Lean Enterprise Institute, general lean reference: https://www.lean.org/

This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.

Want to raise your plant's level with a method?

Download the free e-book Pull Production and see how to design the lean flow.

Download the e-book
Advertisement
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.