
Quick answer: Nemawashi is the Japanese practice of preparing a decision before the formal meeting: you talk one-on-one with the people who will be affected, listen to their objections, adjust the proposal and only then bring the topic to the table. In the meeting, the group confirms what has already been built. In lean culture, it is what supports a change without hidden resistance.
- What is nemawashi
- Why nemawashi matters in Lean
- How to do nemawashi, step by step
- Factory example: replacing batches with a cell
- Template to download: nemawashi map
- Good questions for the one-on-one conversation
- Nemawashi is not manipulation or lobbying
- When not to use it
- Nemawashi and A3: where each one fits
- Checklist before the formal meeting
- Nemawashi across shifts, remote teams and plants
- Common mistakes
- Frequently asked questions
What is nemawashi
Nemawashi (根回し) is a Japanese management term for the preparation done before a decision. The origin is usually explained through gardening: ne means root and mawashi means to turn around. Before transplanting a tree, the gardener digs around the roots little by little, so that it survives the move.
In companies, the image is the same. Before changing a layout, a shift or a method, you "dig around": you talk to each affected person, understand what they fear and adjust the idea. That way, the formal meeting stops being a surprise debate and becomes the moment to confirm a decision that almost everyone already knows.
I believe the term is widely associated with Toyota's decision-making style and with the literature on the Toyota Production System. You should verify the exact wording in the sources at the end if you are going to cite it in academic work.
Why nemawashi matters in Lean
An improvement that touches people's routines only works if those people take part. Nemawashi tackles three common problems:
- Silent resistance: the group agrees in the meeting and boycotts in practice, because nobody was heard beforehand.
- Incomplete proposal: the people who run the process know details that the author of the idea does not see. The one-on-one conversation brings those details up early.
- Long, tense meeting: when the objections have already been handled, the formal meeting is shorter and causes less conflict.
It also fits with the A3 methodology: the one-page A3 is the document you take to each conversation, collect comments on and adjust, until the final version already reflects the opinion of those who will be affected.
How to do nemawashi, step by step
- Define the decision and the deadline. Write in one sentence what will be decided, who decides and when. Without this, the conversation turns into aimless polling.
- Map who is affected. List operators, leaders, maintenance, quality, logistics and the decision maker. The power and interest matrix helps order the list.
- Prepare one page. Problem, current situation, proposal and expected impact, in A3 format or as a one-sheet draft. Make it clear that it is a draft.
- Talk one on one, starting with those who have the most to lose or the most influence. Fifteen to twenty minutes, at the workplace if possible.
- Ask and listen. "What problems do you see in this?", "What would need to happen for this to work in your area?". Take notes and do not argue on the spot.
- Adjust the proposal and send it back. Show what changed because of the conversation. That is what creates trust.
- Take it to the formal meeting. Present the final version, credit the contributions and record the decision with an owner and a date.
If the topic requires data, prepare it beforehand. A vague argument in a one-on-one conversation does more harm than good.
Factory example: replacing batches with a cell
Fictional example, only to show the method. The supervisor of a machining line wants to replace batch production with a U-shaped cell, with an expected reduction in waiting between stations. He maps the affected people and notes each one's position before and after the conversations (scale from 1 = against to 5 = in favor).
| Person | Influence (1 to 5) | Support before | Main concern | Support after |
|---|---|---|---|---|
| Production manager | 5 | 3 | Output drop during the transition | 4 |
| Maintenance lead | 4 | 2 | Access to machines for preventive maintenance | 4 |
| Longest-serving operator | 4 | 1 | Losing the individual pace and the bonus | 3 |
| Quality | 3 | 4 | Lot traceability | 5 |
| Internal logistics | 3 | 3 | New replenishment point | 4 |
| Production planning | 3 | 2 | Change in sequencing | 4 |
Notice the longest-serving operator: he starts against and ends neutral, still with reservations. The goal of nemawashi is not unanimity at any price, but deciding knowing which concerns exist and how to handle them. In this case, the supervisor agreed on a two-week pilot and a review of the bonus criterion, items that came out of the conversations.
Template to download: nemawashi map
I built a simple spreadsheet to organize the conversations: list of people, influence, current support, target support, concern, action and status. The priority is calculated by formula (influence multiplied by the distance between current support and the target), and the summary counts how many conversations are still missing.
Download the nemawashi map (Excel)
Free, editable template. The first row is an example: replace it with your own data.
Good questions for the one-on-one conversation
- What works well today and must not get worse?
- What is the biggest risk you see in this proposal?
- Who else should be heard before the decision?
- What am I not seeing about your area?
- What condition would make this acceptable to you?
- Would you accept testing it for two weeks?
Listen more than you talk. If the person sees the conversation as just a warning, they return resistance. If they see that the idea changed because of them, they return collaboration.
Nemawashi is not manipulation or lobbying
Whoever uses nemawashi to lock in votes beforehand and smother the discussion loses the group's trust. The difference lies in transparency:
| Healthy nemawashi | Manipulation |
|---|---|
| The proposal can change with what you hear | The decision is already made, the conversation is theater |
| Everyone affected is heard, including critics | You only talk to those who already agree |
| The objections appear in the final document | The objections are hidden from the meeting |
| The goal is a better decision | The goal is to win the meeting |
When not to use it
- Emergencies and safety: immediate risk demands quick decisions and action. Explain afterwards.
- Decisions with no impact on other people's work: do not create bureaucracy where it is not needed.
- When there has already been enough conversation: nemawashi is for deciding, not for postponing. Set the deadline.
In larger change programs, combine nemawashi with change management models (ADKAR and Kotter's 8 steps).
Nemawashi and A3: where each one fits
The A3 organizes the reasoning on one sheet. Nemawashi is what happens between the versions of the sheet. Here is how the two fit together:
| A3 section | What you write | Nemawashi at this stage |
|---|---|---|
| Background and problem | Why the topic matters | Confirm with those who live the problem that the description is right |
| Current situation | Process data and facts | Validate the numbers with the area before presenting |
| Cause analysis | Probable causes and evidence | Test the analysis with those who know the process |
| Countermeasures | What will be done | Show the proposal and collect objections and improvements |
| Plan and owners | Who does what and when | Agree the plan with each owner before publishing it |
| Follow-up | How to check the result | Align the indicator with the people who will be measured |
By the time the formal meeting arrives, every line of the A3 has already been seen by the people who matter. Nothing appears for the first time in front of everyone.
Checklist before the formal meeting
- The decision, the deadline and who decides are written in one sentence.
- All affected people have been identified and heard, including the critical ones.
- The main objections are recorded and each one has an answer or an adjustment.
- The final version shows what changed because of the conversations.
- The data used was validated with the area.
- There is a pilot or a contingency plan for the biggest risks.
- Those who will execute already know what is expected of them.
Nemawashi across shifts, remote teams and plants
In a factory with three shifts, the one-on-one conversation must also reach the night shift. Schedule a short conversation at the shift handover or ask the shift leader to collect opinions and bring back the adjustment. In remote teams, use short one-on-one calls instead of group emails, which tend to be answered with silence.
Across plants, start with the local leaders before sending any document from headquarters. A decision that arrives ready-made from outside is usually applied halfway.
Common mistakes
- Starting with the easy conversations and leaving the critic for last.
- Bringing the finished solution and calling it a consultation.
- Not sending the adjusted version back.
- Promising something in the conversation and not delivering.
- Running the whole round with no deadline, until the idea goes cold.
Frequently asked questions
What does nemawashi mean?
It is a Japanese term that, literally, refers to digging around the roots of a tree before transplanting it. In management, it means preparing a decision with one-on-one conversations before the formal meeting.
Is nemawashi the same as lobbying?
No. Lobbying seeks to win a vote. In nemawashi, the proposal changes with what you hear and the objections become part of the final document. Transparency is what separates the two.
What is the relationship between nemawashi and A3?
The A3 is the one-page document you take to the conversations. Each round generates comments that improve the proposal, until the final version already reflects the opinion of those who will be affected.
How long does nemawashi take?
It depends on the size of the change. For an area-level decision, a few days of short conversations are usually enough. For large changes, it can take weeks. Set a deadline so it does not turn into postponement.
Can I use nemawashi in small companies?
Yes. With few people, conversations are quick and the gain is large, because hidden resistance is expensive when everyone depends on each other.
Is nemawashi only for management?
No. Operators, technicians and team leaders can also use it when proposing improvements, talking to the affected colleagues before taking the idea to the supervisor.
Sources
- LIKER, J. K. The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. New York: McGraw-Hill, 2004.
- SHOOK, J. Managing to Learn: Using the A3 Management Process to Solve Problems, Gain Agreement, Mentor, and Lead. Cambridge: Lean Enterprise Institute, 2008.
- Lean Enterprise Institute, general lean reference: https://www.lean.org/
This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.
Want to lead change without resistance?
Download the free e-book Lean for Leaders and see how to involve the team in improvement.
Download the e-book
