Quick answer: Hansei is a Japanese term meaning reflection or self-assessment. In Lean, it is the habit of looking honestly at what was done, acknowledging what went wrong without looking for culprits and turning the learning into action. It is usually done at the end of projects, improvement events and major problems.

Advertisement

What is hansei

Hansei (反省) can be translated as reflection, self-criticism or reconsideration. In Japanese work culture, and especially in the literature on the Toyota Production System, the term describes the act of looking back frankly: what I did, what I could have done differently and what I will change.

I believe hansei is treated by authors such as Jeffrey Liker as part of Toyota's continuous improvement process, alongside kaizen. You should verify the exact way each author describes the concept before citing it.

The central point is the focus on one's own responsibility and on the process, not on blaming others. The question that guides hansei is not "who made the mistake?", but "what can I and the system do better next time?".

Hansei-kai: the reflection meeting

In practice, hansei is usually done in a meeting called hansei-kai (reflection meeting). It happens at natural closing points:

What sets hansei apart from an ordinary lessons-learned meeting is the attitude: each participant, especially the leader, is expected to start by acknowledging their own failures. This creates safety for the group to speak frankly.

Agenda for a hansei meeting (60 minutes)

BlockTimeGuiding question
1. Goal5 minWhat did we want to achieve? What was the success criterion?
2. Facts10 minWhat happened, in order? No opinions, only data and dates.
3. What worked10 minWhat did we do well that should be kept?
4. What failed, in the first person15 minWhat could I have done differently? What did the process allow?
5. Causes10 minWhy did it happen? Use the 5 whys on the main failures.
6. Actions10 minWhat changes from today? Who, what and when?

Record it on one page and follow up on the actions at the next meeting. Hansei without action becomes conversation, and conversation without action reduces trust in the process.

Factory example: a delay in a layout project

Fictional example, only to show the method. A new layout project was planned for 8 weeks and took 11. In the hansei meeting, the team followed the agenda:

BlockWhat the team recorded
GoalFinish in 8 weeks, without stopping the line for more than 2 shifts
FactsMaterial delivery was 2 weeks late; the line stopped for 3 shifts; one machine had to be relocated twice
What workedA 10-minute daily check-in with production; a visual project map
What failed (first person)"I approved the schedule without confirming the delivery date with the supplier"; "I did not review the relocation plan with maintenance"
CauseThe plan had no step to confirm third-party dates or to review with maintenance
ActionsAdd a check of external deadlines to the project template; review with maintenance before moving machines

Note the tone: the failures appear as the speaker's own responsibility, and the actions target the planning process, not the person.

Hansei, retrospective, lessons learned and PDCA

PracticeFocusWhen
HanseiHonest reflection, with personal responsibilityEnd of a project, event or problem
Retrospective (Scrum)Improving how the team worksAt the end of each sprint
Lessons learnedRecording knowledge for other projectsAt project end and at milestones
Check step of PDCAComparing the result with the planIn each cycle

They complement each other. Hansei has the advantage of putting attitude at the center. The result can feed the lessons learned and yokoten, which takes the learning to other areas.

How to start with your team

  1. Pick a recent closing point and schedule 60 minutes.
  2. The leader goes first: acknowledge one of your own failures before asking the others to speak.
  3. Agree on a rule: we talk about facts and process, not culprits.
  4. Write the actions with an owner and a deadline.
  5. Follow up on the actions at the next meeting and show what changed because of the hansei.
Advertisement

Reflection questions to use in the meeting

Hansei record template

Use one page, on paper or in a spreadsheet, with these columns:

FactCauseActionOwnerDeadlineHow we will verify
Material delivery was 2 weeks late (example)The supplier's lead time was not confirmedAdd external deadline confirmation to the project templateProject coordinator15 daysNext 3 projects with the check done

The last column is the one most often forgotten. Without verification, you do not know whether the action solved it.

Safety to speak: the condition for hansei

No agenda works if people are afraid to speak. For hansei to deliver results, the leader must show through actions that acknowledging a mistake brings no punishment, but brings support to solve it. Three habits help: acknowledge your own failures first, thank those who bring bad news and actually act on what is raised.

If the company culture is still one of looking for culprits, start small: a hansei on a small project, with a trusted team, and show the result. The practice spreads by example.

Pitfalls

Frequently asked questions

What does hansei mean?

In Japanese, reflection or self-assessment. In Lean, it is the habit of looking honestly at what was done, acknowledging failures without looking for culprits and turning the learning into action.

What is hansei-kai?

It is the reflection meeting. It normally happens at the end of projects, improvement events or problems, with an agenda of facts, successes, failures, causes and actions.

Is hansei the same as lessons learned?

Not exactly. Lessons learned record knowledge for future use. Hansei puts the attitude of reflection and personal responsibility at the center. They can be used together.

Who should take part in a hansei?

Those who took part in the work, including the leader, who should be the first to acknowledge their failures. Guests from other areas can help with questions about causes.

How often should we do hansei?

At the end of each project, improvement event or major problem, and at regular intervals, such as quarterly. More important than frequency is following through on the agreed actions.

Is hansei only for mistakes?

No. It is also worth doing after a success, to understand what worked and what can be repeated. Reflecting on successes keeps success from being put down to luck.

Sources

  1. LIKER, J. K. The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. New York: McGraw-Hill, 2004.
  2. IMAI, M. Kaizen: The Key to Japan's Competitive Success. New York: Random House, 1986.
  3. Lean Enterprise Institute, general lean reference: https://www.lean.org/

This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.

Want to turn problems into learning?

Download the free e-book Problem Solving Kit and use a simple routine to analyze and act.

Download the e-book
Advertisement
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.