Monitor with a bar chart and a dashed target line, a circular gauge and an approval seal on a production workbench

Quick answer: the quality metrics most used in production are first pass yield (FPY), the scrap and rework rates, PPM (defective parts per million), DPMO, Cpk and the cost of poor quality. Choose a few, define each formula clearly and break results down by cause so you can act.

Advertisement

What are quality metrics

Quality metrics turn quality into numbers. They answer simple questions: how many parts come out good the first time? How many become scrap? How many reach the customer with a defect? How much does that cost?

They serve three purposes: to see performance, to compare shifts, lines and periods and to decide where to act. A metric with no action attached becomes board decoration. So next to each number, you need to know who looks at it, how often and what they do when it misses the target.

The main metrics and their formulas

MetricFormulaWhat it shows
FPY (first pass yield)Parts good the first time ÷ parts started × 100Process effectiveness without rework. See FPY and RTY
Scrap rateParts scrapped ÷ parts produced × 100Permanent loss of material and labor
Rework rateParts reworked ÷ parts produced × 100The hidden cost of doing it again
PPM (parts per million)Defective parts ÷ parts delivered × 1,000,000Quality as the customer perceives it. See PPM
DPMODefects ÷ (units × defect opportunities) × 1,000,000Basis of the sigma level, comparable across products
Cp and CpkCapability of the characteristic relative to the toleranceAbility to produce within specification. See Cp and Cpk
Cost of poor qualityScrap cost + rework + warranty + complaintsFinancial impact. See cost of quality
Corrective action closure timeDays between opening and closing an actionSpeed of response to problems

Point of attention: always define the denominator. "Scrap rate" over parts started, produced or approved gives different numbers. Choose one and standardize it.

Worked example: a lot of 10,000 parts

A teaching example. A line started 10,000 parts in the month. From the data collected: 250 were scrapped, 600 were reworked and recovered, and the customer returned 3 of the shipped parts. The 850 defective parts from the line had 1,250 defects in total, and each part has 5 defect opportunities. Costs: scrap of $40 per part and rework of $6 per part.

MetricCalculationResult
Good the first time10,000 − 250 − 6009,150 parts
FPY9,150 ÷ 10,000 × 10091.5%
Scrap rate250 ÷ 10,000 × 1002.5%
Rework rate600 ÷ 10,000 × 1006.0%
Total approved parts9,150 + 6009,750 parts
Final yield9,750 ÷ 10,000 × 10097.5%
Internal PPM850 ÷ 10,000 × 1,000,00085,000 ppm
External PPM3 ÷ 9,750 × 1,000,000about 308 ppm
DPMO1,250 ÷ (10,000 × 5) × 1,000,00025,000
Cost of poor quality250 × $40 + 600 × $6$10,000 + $3,600 = $13,600

Reading. A final yield of 97.5% looks good, but the FPY of 91.5% shows that 8.5% of the parts go through scrap or rework. The $13,600 cost sits inside that hidden "good". The external PPM is much lower than the internal one, which indicates that final inspection catches most of the defects, but that is expensive and does not solve the cause.

For reference, a DPMO of 25,000 corresponds to about 3.5 sigma, using the usual 1.5 sigma shift convention. Conversion tables vary; use the same one to compare periods.

Note: fictional values to illustrate the calculations. Real costs include material, labor, energy and, for rework, machine time.

Outcome metrics and process metrics

Not every metric arrives at the same time. Combine the two types:

TypeExamplesCharacteristic
Outcome (lagging)External PPM, customer complaints, cost of poor qualityShow what has already happened and the effect on the customer and the results
Process (leading)FPY, scrap and rework per shift, Cpk, process auditsShow what is happening and let you act before the customer is affected

If you only measure external PPM, you find problems late, and after costly inspection. Process metrics flag deviations while there is still time to correct them. Audits, such as the VDA 6.3 process audit and layered process audits, complete the picture.

How to set realistic targets

A well-formed target has a number, a deadline and a plan. Continuing the example of 10,000 parts per month, with an FPY of 91.5%:

Notice that the FPY target comes from adding up the scrap and rework targets, tied to actions. Without a plan, a target is a wish. The money gain also helps prioritize: actions that solve scrap are worth more per part than those for rework.

Advertisement

How to collect data reliably

How to build a simple quality dashboard

Less is more. Five to seven well-defined metrics are worth more than twenty numbers with no owner.

MetricFrequencyWho looksAction when off target
FPY per lineDailyLine leader10-minute meeting at the board
Scrap and rework (% and $)Daily and weeklySupervisor and qualityPareto of causes and corrective action
External PPMMonthlyQuality and managementCause analysis and response to the customer
Cpk of critical characteristicsPer lot or weeklyQuality and processStronger control and process adjustment
Cost of poor qualityMonthlyManagementPrioritizing improvement projects

Show the dashboard at the workplace, with simple charts, a visible target and owners. See best practices in the production dashboard article and in visual management.

From number to action

A metric only has value when it leads to a decision. A practical path:

  1. Break down the result by product, machine, shift and defect type.
  2. Prioritize with the Pareto chart: a few defects account for most of the problem.
  3. Look for the cause with the Ishikawa diagram and the 5 Whys.
  4. Prevent recurrence with poka-yoke, standard work and a control plan.
  5. Verify the effect on the same metric, over the same comparison period.

To track process stability over time, use statistical process control. To decide between recovering and discarding, see rework vs scrap. The 7 basic quality tools bring the whole set together.

Common mistakes with quality metrics

Frequently asked questions

What are the main quality metrics in production?

FPY (first pass yield), scrap rate, rework rate, PPM, DPMO, Cp and Cpk, cost of poor quality and corrective action closure time.

How do you calculate PPM?

Divide the number of defective parts by the number of parts delivered and multiply by 1,000,000. Example: 3 returned out of 9,750 shipped gives about 308 ppm.

What is FPY?

It is first pass yield: the proportion of parts that are good the first time, with no rework or scrap. In the example, 9,150 out of 10,000, or 91.5%.

What is the difference between scrap and rework?

Scrap is the part that is discarded, with a loss of material and labor. Rework is the part recovered with additional work, which still costs money and time.

How many quality metrics should I track?

Five to seven, well defined, with an owner, a frequency and a reaction plan. Too many metrics dilute the focus.

What is DPMO?

Defects per million opportunities: defects ÷ (units × defect opportunities per unit) × 1,000,000. It is the basis for the sigma level.

Sources

  1. ASQ. The Quality Toolbox. Milwaukee: ASQ Quality Press.
  2. MONTGOMERY, D. C. Introduction to Statistical Quality Control. Hoboken: Wiley.
  3. ISO 9001: Quality management systems. Requirements.
  4. Lean Enterprise Institute, general reference on lean: https://www.lean.org/

This article is a teaching guide. The numerical examples are fictional and only show how the calculation works; use your own company's data and criteria. For questions about standards or manuals, consult the official document. See also the learning paths and the A–Z glossary.

Want a metrics dashboard that works?

Download the free Metrics That Matter e-book, with OEE, takt time and visual management.

Download the e-book
Advertisement
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.