What MTM and predetermined time systems are

Predetermined time systems estimate the time of a manual task by adding tabulated values for each basic motion, without a stopwatch. MTM (Methods-Time Measurement) is the best known: you break the work into reach, grasp, move, position and release, and add the times in TMU (time measurement units).

MTM was developed by Maynard, Stegemerten and Schwab and published in 1948. The table values already correspond to a skilled operator at a normal pace, so there is no pace rating step as in a time study.

Advertisement

Visual map of MTM

The map shows the TMU unit, the basic motions and the 381 TMU assembly example.

MTM AND PREDETERMINED TIMES
Visual map 269: MTM Predetermined Time Systems: Estimate Time Without a Stopwatch. Click the map to see it full size.Download the map as PNG

The TMU unit and the basic motions

The TMU is a fraction of an hour, chosen to avoid decimals in the tables:

1 TMU = 0.00001 h = 0.036 s  |  1 s = 27.8 TMU  |  100,000 TMU = 1 h

In MTM-1, the basic motions are:

Each combination of class and distance has a value in the official table. The values in the example below are illustrative; for a real study, use the licensed tables from your country's MTM association.

Example: assembling a housing with 4 screws and a label

Fictional example with illustrative TMU values for a manual assembly station:

ElementRepetitionsTMU eachTMU total
Reach for and grasp the housing11616
Move and position in the fixture13030
Pick up and position the screw438152
Pick up the screwdriver11414
Drive the screw42288
Put the screwdriver back11010
Pick up and apply the label14545
Move the assembly to the box and release12626
Total381

Checked sum: 16 + 30 + 152 + 14 + 88 + 10 + 45 + 26 = 381 TMU. Conversion:

381 TMU × 0.036 s = 13.7 s (normal time)

MTM does not include personal needs, fatigue or unavoidable delays. With a 15% allowance (an example figure; each company sets its own):

standard time = 13.716 s × 1.15 = 15.8 s

In 27,000 s available per shift (7.5 h), the station makes 27,000 ÷ 15.77 = 1,711 parts. With demand of 1,500 parts per day, takt time is 27,000 ÷ 1,500 = 18 s. The 15.8 s standard time fits, at a loading of 15.77 ÷ 18 = 87.6%.

Advertisement

MTM variants

The more grouped the level, the faster the analysis and the lower the detail. Pick the level by series size and cycle length.

MTM or stopwatch?

CriterionMTMStopwatch study
Needs the process runningNo, works for a station still in designYes
Pace ratingNo, the time is already normalYes, subjective
Analysis effortHigh: requires MTM trainingMedium
Compares methods before implementationYesNo
Covers machine and process timeNo, manual work onlyYes, the full cycle

The two complement each other: MTM sets the manual time of a new method; time study validates it on the shop floor.

How to apply it, step by step

  1. Define the method: sequence, part and tool positions, left and right hand.
  2. Break it into basic motions, hand by hand.
  3. Pick the class, distance and weight of each motion in the table.
  4. Add the TMU, removing motions that happen at the same time as another hand's (the longer one governs).
  5. Convert to seconds and add the allowance.
  6. Compare with takt, adjust the layout and method, and redo the calculation. Use the result in the standard work combination sheet and in line balancing.

Because MTM looks at each motion, it points to ergonomic gains: long reaches, trunk turns and difficult positioning. For posture analysis see RULA and REBA, and for the overview see ergonomics in production.

Common mistakes and limits

Frequently asked questions

What does MTM stand for?

Methods-Time Measurement, a predetermined time system that estimates manual time from basic motions.

How much is 1 TMU?

0.00001 hour, or 0.036 second. So 1 second equals 27.8 TMU.

Do I need a stopwatch to use MTM?

No. The time comes from the tables, so you can estimate a station's time before it exists.

Does MTM include allowances?

No. The values correspond to normal pace; add allowances for personal needs, fatigue and delays.

What is the difference between MTM-1 and MTM-2?

MTM-1 analyzes individual basic motions and is more detailed. MTM-2 groups motions and is faster, with less precision.

Who can use the official tables?

Trained practitioners licensed by their country's MTM association. This article uses illustrative values only to teach the calculation.

Advertisement

Sources

  1. MAYNARD, H. B.; STEGEMERTEN, G. J.; SCHWAB, J. L. Methods-Time Measurement. McGraw-Hill, 1948.
  2. NIEBEL, B. W.; FREIVALDS, A. Methods, Standards, and Work Design. McGraw-Hill.
  3. BARNES, R. M. Motion and Time Study: Design and Measurement of Work. Wiley.
  4. ZANDIN, K. B. MOST Work Measurement Systems. CRC Press.

Keep studying: trusted sources and links

Save this address: Manufatura Enxuta is your school for lean manufacturing. Come back whenever you need to study, with a complete article, a visual map and trusted sources. Follow one of the learning paths or check the A–Z glossary.

Want to lead change with a method?

Download the free e-book Lean for Leaders and see how to sustain lean culture day to day.

Download the e-book
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.