Parts shelves at an assembly line with a supplier checking the stock level at the point of use, with a subtle green accent

What VMI and consignment stock are

In vendor managed inventory (VMI) the supplier monitors the customer's stock and decides how much to replenish and when, within agreed minimum and maximum levels. In consignment stock the goods sit at the customer's site but stay owned by the supplier until they are consumed; only then does the customer buy and pay.

These are two different concepts that often travel together. VMI answers "who decides replenishment"; consignment answers "who owns the stock". Either can exist without the other.

Visual map: information flow and stock ownership

The map shows the data flow between customer and supplier, the moment ownership changes, and the numeric example.

VMI AND CONSIGNMENT STOCK
Visual map 215: Vendor managed inventory and consignment stock: how they work. Click the map to see it full size.Download the map as PNG

VMI vs consignment: the difference in one table

CriterionTraditional purchasingVMIConsignment
Who decides replenishmentCustomer (purchase order)SupplierEither party
Who owns the stock at the customerCustomerCustomer, unless agreed otherwiseSupplier until consumption
When the customer paysAfter receiptAfter receiptAfter consumption
Information that flowsOrderStock level and consumptionConsumption and consignment balance
Obsolescence riskCustomerCustomerSupplier

The most common combination is VMI with consignment: the supplier replenishes and still owns what is on the shelf.

How VMI works: min, max and replenishment

The customer shares consumption and stock balance with the supplier through EDI, a portal or a spreadsheet. The supplier uses that data to replenish between two limits.

Min = daily usage × (lead time + safety days)

Max = Min + daily usage × replenishment interval

The minimum covers delivery time and variation; the maximum sets the physical and financial space the supplier may occupy. The safety margin is covered in safety stock, and the classic reorder point in inventory management.

In practice the supplier compares the balance with the minimum every cycle. If the balance is near the minimum, it delivers the difference up to the maximum. The customer stops issuing item-by-item purchase orders.

Worked example: a special fastener at 50 per day

Example (fictitious): an assembler uses 50 units per day of an item that costs R$ 12.00 (Brazilian reais). The supplier lead time is 2 days, safety is 1 day and replenishment happens every 3 days. The month has 20 working days.

Min = 50 × (2 + 1) = 150 units. Max = 150 + 50 × 3 = 300 units. Approximate average stock = (150 + 300) ÷ 2 = 225 units.

Before, the customer bought a monthly lot of 1,000 units (50 × 20) with 150 as safety stock. Average stock was 150 + 1,000 ÷ 2 = 650 units. With a cost of capital of 1.5% per month:

ScenarioAverage stock (units)Value on customer's balance sheetCost of capital per month
Traditional purchasing (monthly lot)650R$ 7,800.00R$ 117.00
VMI without consignment225R$ 2,700.00R$ 40.50
VMI with consignment225R$ 0.00 (supplier-owned)R$ 0.00 at customer; R$ 40.50 at supplier

VMI cuts the customer's stock by 425 units, or R$ 5,100.00 of capital (7,800 − 2,700). With consignment the capital released is R$ 7,800.00. The R$ 40.50 per month moves to the supplier, who recovers it in the price: it equals about 0.34% of the R$ 12,000.00 monthly billing (1,000 × 12). If the supplier's gains in logistics and demand visibility exceed that, the deal works for both sides.

Advertisement

How consignment works in practice

When to use VMI and consignment

Good fitAvoid when
Regular, predictable consumptionVery irregular consumption or project-specific items
Low-value, high-turnover items (C in ABC analysis)Expensive items with high obsolescence risk
A few strategic suppliers, trusted relationshipSupplier without a system to monitor stock
Nearby supplier, frequent deliveryDistant supplier with long lead time
Storage space at the point of useNo access control or inventory discipline

Continuous-use items often pair with supplier kanban or a milk run supply route. To choose partners, see supplier evaluation.

Advertisement

How to implement in 6 steps

  1. Pick the items: start with 10 to 20 items of stable consumption.
  2. Agree on parameters: min, max, replenishment cycle and lead time, using the formula above.
  3. Define the data flow: frequency and format of consumption and balance reporting.
  4. Set commercial rules: price, payment terms, ownership, losses and maximum term.
  5. Adapt the stores: identified area, addressing and controlled access; see inventory valuation for the accounting effect.
  6. Measure and review: stockouts, turnover, deliveries and stock accuracy, monthly (inventory turnover).

Sharing consumption data also helps reduce the bullwhip effect across the supply chain, because the supplier sees real demand instead of inflated orders.

Common mistakes and limitations

Frequently asked questions

What is VMI?

It is the model in which the supplier monitors the customer's stock and decides replenishment between an agreed minimum and maximum.

What is consignment stock?

Goods that sit at the customer but belong to the supplier until consumed. The customer only pays for what it uses.

Are VMI and consignment the same thing?

No. VMI defines who decides replenishment; consignment defines who owns the stock. They can be used together or separately.

How do you calculate min and max?

Min = daily usage × (lead time + safety); max = min + daily usage × replenishment interval. In the example, 150 and 300 units.

Who pays for the stock under consignment?

The supplier carries the capital until consumption and usually recovers that cost through the price or the contract terms.

When is VMI not worth it?

With irregular consumption, expensive items with obsolescence risk, long lead times, or without a reliable stock data system.

Advertisement

Sources

  1. CHOPRA, S.; MEINDL, P. Supply Chain Management: Strategy, Planning, and Operation. Harlow: Pearson.
  2. SIMCHI-LEVI, D.; KAMINSKY, P.; SIMCHI-LEVI, E. Designing and Managing the Supply Chain. New York: McGraw-Hill.
  3. BALLOU, R. H. Business Logistics/Supply Chain Management. Upper Saddle River: Pearson.
  4. SLACK, N. et al. Operations Management. Harlow: Pearson.

Keep studying: trusted sources and links

Save this address: Manufatura Enxuta is your school for lean manufacturing. Come back whenever you need to study, with a complete article, a visual map and trusted sources. Follow one of the learning paths or check the A–Z glossary.

Want real pull production?

Download the free pull production e-book, with kanban, supermarkets and leveling.

Download the e-book
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.