What lean accounting is

Lean accounting reports results by value stream instead of by product or department, using actual costs for the period rather than allocated standard costs. It exists because traditional costing rewards overproduction and hides the gain from cutting inventory and lead time.

Instead of asking "what does each part cost?", the question becomes "how much did the value stream bill and spend this week?". The statement fits on one page and the shop floor can read it.

Lean accounting visual map

The map shows the contrast with standard costing, the value stream statement and the box score.

LEAN ACCOUNTING
Visual map 224: Lean Accounting: Value Stream Costing With a Worked Example. Click the map to see it full size.Download the map as PNG
Advertisement

Why standard costing works against lean

Under absorption costing, fixed cost is divided by units produced. The more you build, the lower the unit cost and the higher the book profit, even when part of the output goes to stock. Here is a fictional example: price $80, variable cost $30 per unit, fixed cost for the period $20,000, and 800 units sold.

MeasureA: builds 1,000B: builds 800
Fixed cost per unit$20.00$25.00
Absorbed unit cost$50.00$55.00
Book profit (absorption)$24,000$20,000
Profit using actual period costs$14,000$20,000
Ending inventory200 units0

Scenario A looks better on the income statement ($24,000 versus $20,000), but it spent $6,000 more on material and labor that now sits in 200 units. Comparing cash on actual costs shows the opposite: $14,000 versus $20,000. That is the wrong incentive for anyone pursuing just-in-time and continuous flow.

Value stream costing

A value stream includes everything needed to deliver a product family to the customer, as defined in value stream mapping (VSM). In lean accounting, costs go straight to the stream, with no machine-hour allocation:

Corporate costs that belong to no stream stay out, or sit at a separate level, with no arbitrary allocation.

Advertisement

Example: weekly value stream statement

Fictional example: the "Valves" stream sells 2,000 units per week at $60.

LineCalculationWeekly amount ($)
Revenue2,000 × 60120,000
Materialspurchases for the week48,000
Labor15 people × 1,40021,000
Equipment and maintenancestream costs6,000
Facilitiesfloor area occupied3,000
Dedicated supportquality and logistics4,000
Total stream cost48,000 + 21,000 + 6,000 + 3,000 + 4,00082,000
Stream profit120,000 − 82,00038,000

Stream margin = profit ÷ revenue = 38,000 ÷ 120,000 ≈ 31.7%

Cost per unit sold is 82,000 ÷ 2,000 = $41.00, and unit margin is $19.00. Nobody needs an allocation table to get these numbers.

The box score

The box score puts operational, capacity and financial measures on the same page. In the example, the stream cut inventory from $328,000 to $213,200 after improvements.

MeasureBeforeAfterHow to calculate
Inventory turns1320(82,000 × 52) ÷ inventory = 4,264,000 ÷ 328,000 and ÷ 213,200
Days of inventory2013inventory ÷ daily cost (82,000 ÷ 5 = 16,400)
Sales per person per week$8,000—120,000 ÷ 15
Available capacity60 h—600 h − 390 h productive − 150 h non-productive

Of the stream's 600 weekly hours (15 people × 40 h), 390 are productive (65%), 150 are losses such as waiting, rework and setup (25%), and 60 are free (10%). At $35 per hour (21,000 ÷ 600), the free capacity is worth $2,100 per week, and it only becomes money if used for more sales or redeployed, never by reflex layoffs. See also inventory turnover.

How to implement in 5 steps

  1. Define the value streams by product family, using VSM.
  2. Assign people, machines and floor area to each stream.
  3. Build the weekly statement with actual costs, in the format of the example.
  4. Create the box score and review it in daily lean management.
  5. Keep standard costing only for what law and auditors require, in parallel, until the transition is done.
Advertisement

Common mistakes

Frequently asked questions

What is lean accounting?

A management model that tracks costs and results by value stream, using actual period data and no allocation of indirect costs.

How is it different from standard costing?

Standard costing divides fixed costs by units produced and rewards overproduction. Lean accounting shows the stream's real spend for the period.

What is a box score?

A table of operational, capacity and financial measures for the stream, such as inventory turns, sales per person and free capacity.

How are inventory turns calculated in the example?

Annual cost of 82,000 × 52 = 4,264,000, divided by 328,000 gives 13 turns. With inventory at 213,200, it is 20 turns.

Does it replace statutory accounting?

No. It complements standard costing with decision information, while statutory accounting follows the applicable standards.

Sources

  1. MASKELL, B. H.; BAGGALEY, B. Practical Lean Accounting. New York: Productivity Press, 2004.
  2. MASKELL, B. H.; BAGGALEY, B.; GRASSO, L. Practical Lean Accounting. 2nd ed. Boca Raton: CRC Press, 2011.
  3. WOMACK, J. P.; JONES, D. T. Lean Thinking. New York: Simon & Schuster, 1996.
  4. JOHNSON, H. T.; KAPLAN, R. S. Relevance Lost. Boston: Harvard Business School Press, 1987.

Keep studying: trusted sources and links

Save this address: Manufatura Enxuta is your school for lean manufacturing. Come back whenever you need to study, with a complete article, a visual map and trusted sources. Follow one of the learning paths or check the A–Z glossary.

Want to measure what really matters?

Download the free e-book on performance indicators and track the losses in your operation.

Download the e-book
Photo of Vagner Soares

About the author

Vagner Soares

Lean Manufacturing & Behavioral Management Specialist

Over 20 years in the automotive and metalworking industries (GM and Dana), Lean Manufacturing practitioner since 2006. SENAI instructor and mentor in Brazil’s Brasil Mais Produtivo program, delivering consulting, training and audits for 50+ companies, combining quality, productivity and people development.